Twenty spreadsheets, and no order could be traced from sale to dispatch.
We studied how a make-to-order furniture maker really ran. Then we designed one system where one order number travels from the sales desk to the truck. It is designed and shown as a clickable sample. It is not in use yet.
Orders lived in the owner's phone and twenty files.
Counted from the client's own files.
Every number in this section was counted by our team from the files the business shared with us.
Order status meant nothing
Of 3,931 order rows, one was marked complete. Production sheets held lists of orders, not records of work done.
CountedThe customer’s name was lost at packing
Once a box was packed, nobody could tell whose order it was. The client put it simply: after packing, they didn't know the customer.
CountedContractor bills could not be trusted
The cushioning billing sheet showed an error in every cell, and one contractor had been paid an advance well beyond the work they had completed.
CountedStock and costing couldn't be trusted
Four material groups had no stock tracking at all, and German Pine was costed 7% above the vendor's rate.
CountedOne order number that walks the factory floor.
Polishing
The polishing station sees the polish reference photo for each order. Bills are calculated from completed work, and a warning stops an advance that runs over earnings.
ORD-2041Walnut finish · photo attachedIn progressORD-2037Natural teak · photo attachedDoneBILL-0072Advance above earned amountBlockedWhat the system is built to reach.
Nothing is in use yet, so these are targets, not results. Each one is measured the same way as the before number.
Before numbers were counted from the client's own files. After numbers are what the design is built to reach once it is in use.
Two steps done. The next two wait on the client.
Clarity
Mapped 13 departments and 6 sales channels, and went through all 20 files to log 24 problems.
DoneSystem
Designed 12 parts and built clickable samples for desktop, tablet and phone.
Designed and shownAutomate
Stock alerts, draft purchase orders and contractor bills from completed work.
Waiting for go-aheadSupport and Improvement
Monthly review of the floor screen, quality checks and cost per order.
NextOther businesses we have mapped.
Peak-season business lost because production planning ran on memory.
Read the case study →Hundreds of daily orders routed to distributors from one person’s memory.
Read the case study →Is your factory floor running on files and phone calls?
A free 30-minute call with someone who knows factory work. You leave with the three things to fix first, in order.