Water cooler manufacturer · Gujarat, IndiaDiagnosis + designed systemManufacturing industry →

Peak season was being lost to memory. We designed the floor to remember.

A 31-person water cooler maker ran nine production lines on paper, eight chat groups and two people’s memory. We mapped the factory floor. Then we designed one record from enquiry to dispatch.

4 → 2Times each order is written downTarget
0% → 100%Enquiries recordedTarget
7Parts built as samples and shown to the ownerCounted
IndustryAppliance manufacturing
Team size31 people, 12 functions
CountryGujarat, India
Work doneDiagnosis + designed system
StageSample built
The situation

Nine lines, eight chat groups, and nobody could see the floor.

The owner came to us because production was disturbed and he wanted to see and control what was happening. Every step was told by voice, and the production head walked the floor to find the status.

  • 1The same order was written four times: chat, order book, stock chart and the accounts software.
  • 2Factory stock lived on a paper chart and warehouse stock in software, so the numbers did not match.
  • 3Purchasing, planning, discounts and even the bank OTP waited on the owner personally.
  • 4Peak-season stock ran out and promised dates were missed.
What we found

Fifteen findings. These four mattered most.

FINDING 01

Peak demand lost, with no proof

Summer orders were roughly three times the regular season, yet nothing recorded what was lost.

FINDING 02

Two stock figures

Factory and warehouse stock were kept in different places, so orders were promised on a wrong number.

FINDING 03

Enquiries never recorded

With no enquiry record, nobody could see the lost demand, and season planning ran on memory.

FINDING 04

Everything waits on the owner

Approval and planning rules lived only in the owner’s head, with nothing written down.

What we designed

One job card carries every order across the floor.

Follow a job card from enquiry to dispatch. Switch the discount to see how a written approval limit keeps the floor moving without the owner.

Example with sample data.
EnquiryLogged, reason if lostOrderStock checked, date promisedOwner approvalOnly above the limitWritten limitLine 1RunningLine 2RunningLine 3RunningLine 4RunningLine 5RunningLine 6JC-0142 in progressLine 7RunningLine 8RunningLine 9RunningQC 1 + QC 2Both checks signedDispatchTransport recordedJC-0142

Job card

On Line 6 · started
The line head marks each step done on his phone. The production board updates live.

Daily stock close

One stock figure
FactoryWarehouse 1Warehouse 2
Closed today by the named stock owner, with a written reason for any difference.

Approval limit

Within the limit
Clears by itself. The owner sees it in his daily view, but nothing waits for him.
Results and targets

What the design is built to change.

4 → 2Times each order is written down (target)
0% → 100%Enquiries recorded (target)
2 → 1Stock records for factory and warehouses (target)
5–10 → <2Minutes to answer “is this model in stock?” (target)

Nothing is in use yet. Before figures were stated by the client or counted from the order flow. Every after figure is a design target, to be measured once Phase 1 is in use.

How the project went

Studied, designed and shown as a sample.

See all four steps →
01Done

Clarity

A workshop at the factory and four follow-up rounds mapped how enquiries, stock, production and approvals really moved.

02Designed

System

Six improved ways of working and a clickable sample with seven parts, shown to the owner.

03Planned

Automate

Reorder levels that raise purchase requests, and written approval limits that clear by themselves.